Delivering on Time

An example of James Alpe Sign & Design’s tendency to exceed initial client expectations, our work with Hyndburn Homes progressed into a multi-phase project with tight deadlines and various challenges to be met. Originally, we were asked to complete a contract for the creation and application of vehicle graphics for 38 of Hyndburn’s fleet of Ford Transit vans, working with them to define design layout and specifications.

Whenever, Wherever

Due to time constraints and logistical concerns, the work was carried out in Wigan, rather than at our dedicated Lancashire premises. Our professional team created a proposal of work schedule which allowed us to design and apply livery for further vehicles, including six Transit Tippers, two Transit Connects and an electrically powered Renault Kangoo.

Even with the exacting timescales, we were able to achieve the required standards thanks to our collaborative strategy and innovative approach, completing the entire scheme of work between January and April 2013.